2026-04-03

Challenging excavation down to the bedrock - Nepean

We received the engineering drawing that required a precise “F” shape excavation to be conducted down to the bedrock in order for two distinct foundations to be linked together once concrete footing is poured.

Previous

Land clearing for a custom new home build - part 1

Next

Commercial culvert maintenance - Dunrobin