Skip to Videos
  • 2026-08-09

    Retaining wall extension - gravel laneway overhaul

    We were happy to answer the call for a request to extend a retaining wall for the owner to better use their green space and maximize water drainage. At the same time we completed their laneway overhaul for an enhanced curb appeal and water management for years to come.

  • 2026-08-09

    Service roads (2) for new home project

    After the two excavations we did for the new home build project we were back to install two service roads to ensure heavy equipment such as concrete and well drilling trucks could safely access the worksite.

  • 2026-08-09

    Another gravel laneway overhaul - Dunrobin

    The first step in overhauling a laneway is always to reset the base to regrade and prepare it for a fresh new layer of aggregate. Matching grade with existing land and sloping it to manage water drainage are only a few of the key considerations that ensure a long-lasting result.

  • 2026-07-31

    Culvert replacement - sinkhole: Dunrobin

    When a local resident was faced with a sinkhole caused by a collapsed culvert we were happy to answer the call. From ensuring the proper grading and slope of the culvert, to using the right type of aggregate and compacting during the backfill, this project was completed on-time and on budget.

  • 2026-07-24

    Brush mowing - farm fields (Dunrobin)

    It is always a pleasure to support a local farm - we were called for the owner to be able to reclaim 5-8 acres of their fields. Our brush mower made the job a breeze and the results were instantaneous.

  • 2026-07-18

    New home build excavation project - final: Dunrobin

    We completed the excavation for two new home build in Dunrobin with complete accuracy and per engineering drawings.

  • 2026-07-16

    New home build excavation project - part 2: Dunrobin

    With the latest 3D GPD technology we happily take engineering drawings before the excavation is performed with the utmost accuracy and results. No guessing - just results.

  • 2026-07-15

    Day 1 of 2: excavation for new home build project (Dunrobin)

    Excavating for a new home build project requires training, knowledge and the right equipment. With the latest 3D GPS technology we continue to deliver projects on-time and on budget.

  • 2026-07-10

    Retaining wall - Part 2 (Dunrobin)

    We completed the retaining wall, overhauled the laneway and created a roundabout extension to make the client’s property more practical, while increasing the curb appeal.

  • 2026-07-08

    Retaining wall - Part 1 (Dunrobin)

    Installing a retaining wall requires training, knowledge and coordination before the first stone can be laid. It starts by preparing the ground to ensure a strong base is established for a long lasting quality product.

  • 2026-07-04

    Backyard transformation - Part 1

    For the golfing lovers, picture your putting green with a back wall of boulders - that is the initial part of what we laid out today but stay tune for the next and final part.

  • 2026-07-03

    Repairing a collapsed laneway above a culvert

    With how unpredictable thunderstorms and flash floods can be we were happy to repair this collapsed laneway above its culvert by reinforcing it with gabion stones before using 2’’ Granular B. Proven results that are made to withstand the harsh Canadian winters.

  • 2026-06-19

    Retaining Wall - Part 2

    We completed this great and unique retaining wall - what a nice transformation this latest project made for the owners. Built right, the first time.

  • 2026-06-17

    Retaining wall - guillotine stones (part 1)

    A retaining wall brings a lot of curb appeal and maximizes the use of your property. We used guillotine stones due to their durability and ease of use, on top of a compacted 12’’ of GA (Granular A). On this property it will divide the area between the swimming pool, the fire pit area, and the rest of the backyard.

  • 2026-06-14

    Utility trench and base preparation for retaining wall

    We followed the step-by-step approach for the utility trench before preparing the base for the retaining wall we will install. From using the right thickness of hydro sand for the utility trench, to compacting the thick layer of aggregate, it is now ready for the exciting retaining wall project.

  • 2026-06-06

    Managing multiple job sites

    Ever wondered what it takes to manage multiple job sites? Look no further as we were happy to make progress to ensure that each site is ready for the next step. Having a large enough fleet of heavy machinery means that we can timely meet your needs.

  • 2026-06-06

    A custom trail starts with your vision

    A custom trail starts with your vision before we bring our training and equipment to deliver you the project you deserve. Operating in zero visibility environment requires training and experience to ensure the safe delivery of the trail you can enjoy for years to come.

  • 2026-05-28

    Preparation for concrete pad - pool and house

    We were called to prepare the ground for a concrete pad around the house and pool area. Using nothing less than 12’’ Granular A for optimal results, this site is ready to be taken to the next step.

  • 2026-05-28

    Controlled demolition - Ashton

    When a structure that is attached to a main house requires demolition, it requires planning, training and experience to ensure a safe execution. We were happy to deliver another on-time and on budget project.

  • 2026-05-24

    Rural development project: Excavation

    We were happy to complete an excavation for a multi-story condo unit. Our Link-Belt 260 is equipped with the latest Rototilt RC8 which made the project a breeze. On time and on budget, the site is now ready for the concrete crew to take it to the next step.

  • 2026-05-24

    Gravel Laneway overhaul - Woodlawn

    When a laneway shows signs of fatigue, loss of gravel at the surface over time leave potholes. This is when a reset of the base is required before applying new gravel. We also pack the gravel in layers using a dual drum packer.

  • 2026-05-13

    Precision excavation - home addition

    Precision excavation requires skills, training and technological equipment. This is exactly what we brought when we conducted an excavation for a home addition project.

  • 2026-04-30

    Agricultural field drainage and culvert replacement

    We were happy to help a nearby agricultural field by recreating the needed ditches that Mother Nature had taken over. We also replaced collapsed and worn out culverts to maximize drainage and yield efficiency.

  • 2026-04-20

    Aerial view of a site preparation and the beginning of the work for the laneway

    Preparing a site for a custom new home project presents unique challenges that must be carefully coordinated. Assessing the drainage requirements, stripping the top layer of organic soil and, elevating the ground if necessary only constitute a few of the many moving parts to ensure that the laneway is on solid ground.

  • 2026-04-12

    Land clearing for a custom new home build - part 2

    After the first day, we came back to finalize the preparation of the area by removing all the top organic soil that will soon set the stage for a 60m long laneway.

  • 2026-04-12

    Land clearing for a custom new home build - part 1

    When engineering drawing were handed over to us we made sure that the site was prepared, including the removal of all the stumps to set the ground for the initial stage of this great project.

  • 2026-04-03

    Challenging excavation down to the bedrock - Nepean

    We received the engineering drawing that required a precise “F” shape excavation to be conducted down to the bedrock in order for two distinct foundations to be linked together once concrete footing is poured.

  • 2026-04-03

    Commercial culvert maintenance - Dunrobin

    When the ground level above the commercial culvert was sagging we happily conducted a maintenance of it by exposing the culvert before solidifying the base with gabion stones.

  • 2026-02-19

    Summary of each skidsteer attachment

    Depicts what each skidsteer attachment can do. From site preparation, to grading, to land clearing, to laneway overhaul, we come prepared to deliver.

  • 2026-01-20

    The moving parts behind a septic project

    We share with you some behind the scenes moments when tackling a septic upgrade project.

  • 2026-01-20

    Overview of a septic project

    We share with you some of the basics behind a septic system upgrade project.

  • 2026-01-20

    Meaning of Ballyduff Farms

    We share with you the Irish roots and meaning of Ballyduff Farms.

  • 2026-01-20

    How the business started

    Ever wondered how small businesses grow? They each have their own story and we were happy to share ours.

  • 2025-07-30

    Residential/Commercial site preparation

    Our 8-way precision grading blade comes with advanced precision for your residential or commercial needs - simultaneously integrates up to 2 slopes.

  • • 2025-04-12

    Gravel laneway overhaul

    Whether your gravel laneway is showing signs of fatigue, or if you are looking at preparing the perfect seed beds around your property, our Jenkins 7’ soil conditioner is perfectly engineered to bring you the results you have been looking for.

  • • 2025-02-09

    Custom trail

    Our equipment and skills operators are ready to customize the trail you and your family have been waiting for. No matter the scope, we will bring to life the ideas you have.

  • 2024-12-15

    Land Clearing

    Promotion video - brush mower