2026-05-24

Gravel Laneway overhaul - Woodlawn

When a laneway shows signs of fatigue, loss of gravel at the surface over time leave potholes. This is when a reset of the base is required before applying new gravel. We also pack the gravel in layers using a dual drum packer.

Previous

Rural development project: Excavation

Next

Precision excavation - home addition