Hydro trench (part 1) - Orleans

After we had done the excavation and backfill for this multi-story condo new build project, it was time to handle the hydro trench between the pole and each hydro meter. A hydro trench requires a consistent depth which is required to be measured before an initial layer of hydro sand can be put in.